Risk Assessment and Coping Strategies in Power Engineering Project Management

Download as PDF

DOI: 10.23977/ferm.2024.070117 | Downloads: 8 | Views: 140

Author(s)

Shuang Li 1

Affiliation(s)

1 Chn Energy Longyuan Environmental Protection Co., Ltd., Beijing, China

Corresponding Author

Shuang Li

ABSTRACT

Power engineering projects are important infrastructure of the economy, which are of great significance to guarantee social production and people's life. However, due to the complexity and uncertainty of power engineering projects, there are various risks in the process of project management. These risks may affect the progress, quality, cost and other aspects of the projects adversely, and may even lead to the failure of the projects. Therefore, risk assessment and the development of corresponding coping strategies for power engineering projects are of great significance to ensure the smooth implementation and successful completion of the projects. In this paper, we will discuss in depth the risk assessment and coping strategies in the management of electric power engineering projects. By understanding the methods of risk assessment and formulating the corresponding coping strategies, we can better cope with the risks in the projects to ensure the smooth implementation and successful completion of the projects, and we hope that this paper can provide useful references and lessons for the management of electric power engineering projects.

KEYWORDS

Power Engineering; Project Management; Risk Assessment

CITE THIS PAPER

Shuang Li, Risk Assessment and Coping Strategies in Power Engineering Project Management. Financial Engineering and Risk Management (2024) Vol. 7: 114-118. DOI: http://dx.doi.org/10.23977/ferm.2024.070117.

REFERENCES

[1] Yue G , Hongbin Z , Haibo L .Analysis of EMC Mode Project's Risks and Strategies in Power grid Enterprises[J]. Electrical Engineering, 2015.
[2] Chauvel L, Chauvel L .Study on the risk management of BOT project based on BP neural network[C]//International Conference on Information Science & Engineering. IEEE, 2011.DOI:10.1109/ICISE.2010.5691566.
[3] Jia, Min. Analysis of information technology implementation barriers and coping strategies in Chinese construction enterprises[C]//International Conference on Management Science & Engineering. IEEE, 2011.DOI:10. 1109/ ICMSE. 2010. 5719788.
[4] Ke N .Discussion on Implementation of Overseas Engineering Risk and Coping Strategies [J].Building Technology Development, 2016.
[5] Tao C .Exploration and Thinking of Project Risk Management in Aviation Engineering Project [J].Aeronautical Science & Technology, 2016.

Downloads: 16507
Visits: 338445

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.