Causes and Control Measures of Floating Tube Sheet in Metro Shield Tunnel
DOI: 10.23977/jceup.2024.060406 | Downloads: 48 | Views: 709
Author(s)
Wang Fei 1, He Chanlong 1, Liu Qibin 1, Yao Shenghui 2, Zhu Chenyang 2, Shen Mingrui 2
Affiliation(s)
1 China Communications Fourth Engineering Bureau Second Engineering Co., Ltd., Luoyang, Henan, 471000, China
2 School of Civil Engineering, Henan Polytechnic University, Jiaozuo, Henan, 454000, China
Corresponding Author
Yao ShenghuiABSTRACT
During the tunnel boring construction of shield tunnel, the tunnel tubes are floated due to the influence of many factors such as tubes installation process, groundwater level, tubes grouting, and site conditions, which leads to tubes misalignment and breakage. Therefore, in order to ensure the construction quality, it is necessary to study the factors of tube sheet uplift. Relying on a rail transit project example, this paper investigates the uplift factors of tube sheet lining structure after on-site investigation and analysis of engineering quality defects. The results show that the uplift of the pipe sheet is caused by the presence of groundwater, improper setting of the tunneling parameters of the shield machine, and the failure of the grouting slurry to solidify in time. For the existence of groundwater, the grouting holes can be opened and released to reduce the impact of groundwater; the parameters of the shield machine should be adjusted according to the advancing distance, the nature of the ground surrounding rock and the tunnel design line; the grouting slurry should be adjusted according to the engineering geological conditions and the situation around the tunnel. The results of the study can provide some valuable references for the factors and treatment measures of shield tube sheet floating during the shield construction process.
KEYWORDS
Shield tunnel, tube uplift, groundwater, shield parameters, groutingCITE THIS PAPER
Wang Fei, He Chanlong, Liu Qibin, Yao Shenghui, Zhu Chenyang, Shen Mingrui, Causes and Control Measures of Floating Tube Sheet in Metro Shield Tunnel. Journal of Civil Engineering and Urban Planning (2024) Vol. 6: 43-52. DOI: http://dx.doi.org/10.23977/jceup.2024.060406.
REFERENCES
[1] ZHANG Zhongfu. Analysis of reasons and countermeasures for uplift of tube sheet in formed shield tunnel[J]. Urban Construction Theory Research(Electronic Edition),2024,(21):167-169.
[2] XIA Ming,ZHANG Huipeng,ZHANG Zhiqiang,et al. Influence factors of tube sheet uplift of shield tunnel in muddy siltstone stratum[J]. Urban Rail Transportation Research,2024,27(07):120-126.
[3] ZHANG Zhiyong. Analysis of reasons and countermeasures for tube sheet uplift in shield tunnel[J]. Value Engineering, 2018,37(06):143-145.
[4] ZHANG Dongxiao,LI Chao,LU Dazhan,et al. Mechanism analysis and control research of tube sheet floating in shield tunnel[J]. Railway Standard Design,2011,(07):95-97.
[5] DONG Saishuai, YANG Ping, JIANG Chunyang, et al. Analysis of mechanism and control of tube sheet uplift in shield tunnel[J]. Journal of Underground Space and Engineering,2016,12(01):49-54.
[6] Yun Wang. Research on uplift mechanism and prevention technology of tube sheet in subway tunnel in hard rock area[J]. Railway Construction Technology,2022,(12):170-173+206.
[7] CHANG Jiang, ZHAO Yi, WANG Yan. Analysis of reasons and control measures for floating of tube sheet in shield tunnel[J]. Municipal Technology,2010,28(03):123-125.
[8] WANG Xinqiang,YAN Qixiang,SUN Minghui,et al. Analysis of the effect of synchronized grouting on tube sheet uplift in shield tunnel[J]. Railway Construction,2022,62(02):118-122.
[9] WANG Xuandong. Analysis and control technology of uplift factors of shield tunnel tubes in sandy soil layer[J]. Shanghai Construction Science and Technology, 2020,(02):36-38.
[10] WU Yong. Research on the mechanism and control technology of shield tunnel tube sheet floating[D]. Anhui University of Architecture,2023.
[11] Hu Yuchen. Analysis of factors affecting the uplift of shield tunnel tubes in water-rich strata[J]. Shanxi Construction,2023,49(13):164-166.
[12] CAI Xiaoming,PAN Hong,LUO Guanyong,et al. Calculation of vertical deformation of soft soil caused by large diameter shield construction[J]. Journal of Henan University of Science and Technology (Natural Science Edition), 2023, 42(01): 185-193.
Downloads: | 10685 |
---|---|
Visits: | 337793 |
Sponsors, Associates, and Links
-
Journal of Sustainable Development and Green Buildings
-
Landscape and Urban Horticulture
-
Bridge and Structural Engineering
-
Soil Mechanics and Geotechnical Engineering
-
Journal of Municipal Engineering
-
Heating, Ventilation and Air Conditioning
-
Indoor Air Quality and Climate
-
Computer Aided Architecture Design