Education, Science, Technology, Innovation and Life
Open Access
Sign In

Study on Settlement Monitoring Quality and Construction Control Technology of Highway Filling Subgrade

Download as PDF

DOI: 10.23977/jceup.2024.060407 | Downloads: 32 | Views: 737

Author(s)

Kaitong Li 1, Peng Zhan 1, Xiaodong Nian 2

Affiliation(s)

1 Municipal Engineering Branch Inst, Broadvision Engineering Consultants Co., LTD, Kunming, China
2 Yunnan Yunjiaoke Testing Technology Co., LTD, Yunnan Institute of Transportation Planning and Design, Kunming, China

Corresponding Author

Kaitong Li

ABSTRACT

With the rapid development of our country's transportation infrastructure construction, the highway construction has become an important support for the economic development. One of the core structural elements of expressway is roadbed, whose quality directly affects the overall quality, durability and safety of highway engineering during construction and operation. In the process of subgrade construction, the speed control of filling operation and the time sequence arrangement of each level of road construction are highly dependent on the monitoring and prediction of subgrade settlement. Both the immediate settlement during highway construction and the long-term settlement after completion have a direct impact on the construction quality and safety performance of the project. Therefore, the scientific monitoring and accurate prediction of subgrade settlement will play an important role in controlling the settlement during the filling period and the settlement after construction. As a key component of highway informatization construction technology system, subgrade settlement prediction is not only a technical challenge, but also a key strategy to ensure project quality. Therefore, strengthening the prediction ability of subgrade filling stage and settlement after completion, especially for sections under special geological or design conditions, and flexibly adjusting construction plan and optimizing operation sequence according to the prediction results, is one of the effective ways to ensure the timely and quality completion of the project and improve the overall safety performance. This methodology not only reflects the refinement and intelligence of construction management, but also is an indispensable part of modern highway construction. Based on the technology of embankment settlement monitoring and construction control, this paper discusses the quality of embankment settlement monitoring and the concrete application of construction control technology through detailed theoretical analysis. Combining grey system theory, settlement observation method and soft soil subgrade settlement control technology, this paper aims to put forward a set of scientific and effective settlement monitoring and construction control system to provide theoretical support and technical guidance for highway construction.

KEYWORDS

Highway; Settlement monitoring; Subgrade filling; Construction technique

CITE THIS PAPER

Kaitong Li, Peng Zhan, Xiaodong Nian, Study on Settlement Monitoring Quality and Construction Control Technology of Highway Filling Subgrade. Journal of Civil Engineering and Urban Planning (2024) Vol. 6: 53-60. DOI: http://dx.doi.org/10.23977/jceup.2024.060407.

REFERENCES

[1] Wang Z ,Zhu J ,Ma T .Review on monitoring of pavement subgrade settlement: Influencing factor, measurement and advancement[J].Measurement,2024,(237):115225.
[2] Yang D, Xiongjun H ,Chao W , et al. Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area[J].Scientific Reports,2022,12(1):19327.
[3] Yang Z ,Gan W ,Ding H .Settlement Control Standards of Construction and Expansion for Mountainous Highway Roadbeds[J].Journal of Architectural Research and Development,2024,8(2):43-49.
[4] AsaokaA.Observational Procedure of settlement Prediction[J].Soils and Foundation,1978,18(4):95-101.
[5] Lin Q T ,Chou X .Comparison and Analysis of Permafrost Railway Subgrade Settlement Deformation Monitoring[J]. Applied Mechanics and Materials,2012,2031(226-228):1651-1654.
[6] YaHu Tian,YuPeng Shen,WenBing Yu, et al.Monitoring and analysis of ground temperature and deformation within Qinghai Highway subgrade in permafrost region[J].Research in Cold and Arid Regions,2015,7(04):370-375.
[7] Deng Julong.The Meaning of Grey Inputb in GM(1,1).The Journal of GreySystem,1999(1):60.
[8] Wang Y ,Liu C .A New Fractional-Order Grey Prediction Model without a Parameter Estimation Process[J].Fractal and Fractional,2024,8(7):396.
[9] Zhang, Qinglong ,Zhu, Yanwen,Wu, Chuping, et al.Compaction Quality Control and Assurance of Silt Subgrade Using Roller-Integrated Compaction Monitoring Technology[J].Journal Of Testing And Evaluation, 2024,52(01):78-98.
[10] Kang G .Influence and Control Strategy for Local Settlement for High-Speed Railway Infrastructure[J]. Engineering, 2016, 2(3):374-379.

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.