Education, Science, Technology, Innovation and Life
Open Access
Sign In

Idle Land Revitalization through PPP: A Comparative Analysis of Operational Models and Financial Sustainability in East Asian Urban Regeneration

Download as PDF

DOI: 10.23977/accaf.2026.070107 | Downloads: 0 | Views: 11

Author(s)

Jyh-Harng Shyng 1

Affiliation(s)

1 Life Sciences College, Zhaoqing University, Zhaoqing, Guangdong, China

Corresponding Author

Jyh-Harng Shyng

ABSTRACT

Idle land and brownfield sites constitute a growing urban challenge across East Asian cities confronting post-industrial transition and fiscal constraint. Public–private partnership (PPP) models have emerged as a promising mechanism for revitalizing such sites, yet operational architectures and financial sustainability vary considerably across institutional contexts. This study conducts a comparative analysis of three PPP models deployed in East Asian urban regeneration: China's government-zero-investment BOT model (exemplified by the Shipaili Cultural and Creative Block), Japan's disaster-mitigation community-driven redevelopment model, and Korea's public corporation-led urban regeneration PPP. Drawing on project financial data, institutional analysis, and the Value-for-Money (VFM) framework, the paper compares government investment share (0% to 45%), private IRR (4.3% to 6.5%), payback periods (14 to 18 years), and VFM outcomes. A horizontal four-stage financial sustainability assessment framework—Revenue Streams → Cost Structure → Net Cash Flow → Sustainability Thresholds—is proposed and applied. Findings reveal that operational model selection is primarily institutionally driven, with each model exhibiting distinct sustainability profiles: the Chinese model is viable but fragile, the Japanese model achieves the most balanced risk–return profile, and the Korean model generates the highest absolute VFM but requires the strongest institutional capacity. Policy implications for matching PPP models to local institutional maturity are discussed.

KEYWORDS

Public–private partnership; Idle land revitalization; Urban regeneration; Financial sustainability; Operational model; East Asia

CITE THIS PAPER

Jyh-Harng Shyng. Idle Land Revitalization through PPP: A Comparative Analysis of Operational Models and Financial Sustainability in East Asian Urban Regeneration. Accounting, Auditing and Finance (2026). Vol. 7, No.1, 60-66. DOI: http://dx.doi.org/10.23977/accaf.2026.070107.

REFERENCES

[1] Ishiwatari, M., Kawakami, H., Sasaki, D., Sakamoto, A., & Nakayama, M. (2024). Enhancing disaster resilience for sustainable urban development: Public–private partnerships in Japan. Sustainability, 16(17), 7632. https://doi.org/10.3390/su16177632
[2] Shyng, J.-H. (2023). Based on the application of VFM and PSC integration in infrastructure PPP project feasibility assessment [Unpublished working paper]. Department of Landscape Architecture, Zhaoqing University. https://doi.org/10.1051/shsconf/202418301006
[3] Shen, Y., Guo, F., & Li, Z. (2020). Local government fiscal capacity, business environment, and PPP project attraction. Finance & Trade Economics, 41(12), 68–84.
[4] Nikityuk, L. G., & Timchyuk, O. G. (2021). Development of PPP-based investment and construction projects. IOP Conference Series: Earth and Environmental Science, 751, 012162. https://doi.org/10.1088/1755-1315/751/1/012162
[5] Hodge, G. A., & Greve, C. (2007). Public–private partnerships: An international performance review. Public Administration Review, 67(3), 545–558. https://doi.org/10.1111/j.1540-6210.2007.00736.x
[6] Shen, Y., & Li, Z. (2021). The impact of local government fiscal capacity on private sector PPP participation and its mechanism. Public Finance Research, (1), 116–129.
[7] Shen, Y., & Zong, Q. (2022). Location disadvantage, social capital participation in PPP projects, and investment quality. Public Finance Research, (10), 46–59.
[8] Guo, Y., Chen, C., Luo, X., & Martek, I. (2024). Determining concessionary items for "availability payment only" PPP projects: A holistic framework integrating value-for-money and social values. Journal of Civil Engineering and Management, 30(5), 441–460. https://doi.org/10.3846/jcem.2024.21351
[9] Zhang, X. (2005). Critical success factors for public–private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), 3–14. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(3) 

Downloads: 14254
Visits: 299816

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.