Risk Assessment of Malaysia East Coast Rail Link Project
DOI: 10.23977/jsoce.2022.040102 | Downloads: 84 | Views: 1256
Author(s)
Hanwen Ye 1
Affiliation(s)
1 Yunnan University of Finance and Economics, Kunming, Yunnan, China
Corresponding Author
Hanwen YeABSTRACT
The east coast rail link project (ECRL) is the largest economic and trade cooperation project between China and Malaysia up to now. This paper makes a risk assessment of ECRL project from the perspective of Chinese enterprises and proposes possible solutions.
KEYWORDS
Ecrl, Political risk, Social risk, Economical risk, Analysis, SolutionsCITE THIS PAPER
Hanwen Ye, Risk Assessment of Malaysia East Coast Rail Link Project. Journal of Sociology and Ethnology (2022) Vol. 4: 7-10. DOI: http://dx.doi.org/10.23977/jsoce.2022.040102.
REFERENCES
[1] Craig A. Lockard, Zakaria Bin Ahmad, Ooi Jin Bee, Thomas R. Leinbach. (2020). Malaysia, Encyclopedia Britannica ,[online] Available: https://www.britannica.com/place/Malaysia/Economy
[2] East Coast Rail Link (ECRL) Project, Malaysia. (n.d.), [online] Available: https://www.railway-technology.com/projects/east-coast-raillink-ecrl-project/
Downloads: | 23162 |
---|---|
Visits: | 599260 |
Sponsors, Associates, and Links
-
Journal of Language Testing & Assessment
-
Information and Knowledge Management
-
Military and Armament Science
-
Media and Communication Research
-
Journal of Human Movement Science
-
Art and Performance Letters
-
Lecture Notes on History
-
Lecture Notes on Language and Literature
-
Philosophy Journal
-
Science of Law Journal
-
Journal of Political Science Research
-
Advances in Broadcasting