Study on Load Optimal Distribution of Power Plant Considering the Quick Start and Stop of Coal Mills

Download as PDF

DOI: 10.23977/ssge.2021.030111 | Downloads: 10 | Views: 668

Author(s)

Xu Hao 1

Affiliation(s)

1 China Energy Longyuan Environmental Protection Co., Ltd.

Corresponding Author

Xu Hao

ABSTRACT

In order to meet the requirements of rapid load change for coal-fired power plants under the situation of new energy power system, this paper studies the problem of rapid plant level load optimal distribution considering the start-up and shutdown section of coal mills. Firstly, a mathematical model of rapid plant level load optimal distribution considering the start-up and shutdown interval of the coal mill is constructed. Taking the start-up and shutdown interval of the coal mill as a constraint condition, the non operational region processing strategy is used for pretreatment, and the improved genetic tabu algorithm is used to find the optimal solution of the objective function. The simulation results show that the distribution results obtained by taking rapidity as the goal and economy as the goal are significantly different. The load adjustment time with rapidity as the goal is significantly shorter than that with economy as the goal. The effectiveness of the model and algorithm is illustrated, and it is verified that the plant level load optimal allocation with the goal of rapidity is an effective control strategy for the rapid load change of units, which can contribute to further improving the flexible operation capacity of coal-fired units under the situation of new energy power system.

KEYWORDS

Load optimal distribution; new energy power system; prohibited operating zones; improved GA-TS algorithm; speediness; coal mill

CITE THIS PAPER

Xu Hao, Study on Load Optimal Distribution of Power Plant Considering the Quick Start and Stop of Coal Mills. Smart Systems and Green Energy (2021) Vol. 3: 54-60. DOI: http://dx.doi.org/10.23977/ssge.2021.030111.

REFERENCES

[1] Schiffer H W. Flexible operation of coal-fired power plants in Germany under the renewable energy background [J]. Cornerstone, 2014, Vol.2(No,4): 26-31 (in Chinese).
[2] Jaquelin Cochran, Debra Lew, Nikhil Kumar. Improve the flexibility of coal-fired power plants: from the baseload power to the peakshaving power [J]. Cornerstone, 2014, Vol.2(No,4): 49-53 (in Chinese).
[3] LIU Jizhen, ZENG Deliang, TIAN Liang, et al. Control Strategy for Operating Flexibility of Coal-fired Power Plants in Alternate Electrical Power Systems [J]. Proceedings of the CSEE, 2015, Vol.35(No.21): 5385-5394.
[4] Hou Yunhe XX, Wu Yaowu. Enhanced particle swarm optimization algorithm and its application on economic dispatch of power systems [J]. Proceedings of the CSEE, 2004, Vol.24(No.7): 95-100.
[5] Tang Wei LD. Chaotic optimization for economic dispatch ofpower systems [J]. Proceedings of the CSEE, 2000, Vol.20(No.10): 36-40.
[6] Wu Jinhua WY, Xiong Xinyin, Zhong Dehui. Random Tabu Search with Simulated Annealing approach for the unit commitment problem [J]. Power System Technology, 2003, Vol.27(No.10): 35-8.
[7] Chen Haoyong WX. Optimization Methods of Unit Commitment Problem [J]. Automation of Electric Power Systems, 1999, Vol.23(No.4): 51-6.
[8] Chen Yanqiao NM, Liu Jizhen, Wei Xiangguo. Application of Real-code Genetic Algorithm to Economic Load DisPatch in Power Plants [J]. Proceedings of the CSEE, 2007.7, Vol.27(No.20): 107-12.
[9] Yu Tingfang LZ. Application of Float Genetic Algorithms-Partially Solved Combined With Punishing Function in Power Plant Units Commitment Problem [J]. Proceedings of the CSEE, 2009, Vol.29(No.2): 107-12.
[10] Wang Zhiguo LJ, LIU Ji-zhen, Tan Wen, Yang Guangjun. Multi-objective Optimal Load Distribution Based on Speediness and Economy in Power Plants [J]. Proceedings of the CSEE, 2006.10, Vol.26(No.19): 86-91.
[11] LI Xue-bin. Study of Multi-objective Optimization and Multi-attribute Decision Making of Economic Load Dispatch Problem [J]. Proceedings of the CSEE, 2008, Vol.28(No,35): 102-107.
[12] Wang Zhiguo LJ, LIU Ji-zhen, Tan Wen, Yang Guangjun. Research and Discussion of Optimal Load Distribution in Powwer Plant Based on Speediness [J]. Modern Electric Power, 2006, Vol.23(No.2): 68-71.
[13] T. Yalcinoz HA, U. Hasan. Constrained economic dispatch with prohibited operating zones: a Hopfield neural network approach [J]. Proceedings of the 10th Electrotechnical Conference, Mediterrranean,2000, 2000, Vol. 2(570-573).
[14] Fred N. Lee AMB. Reserve constrained economic dispatch with prohibited operating zones [J]. IEEE Transaction on Power Systems, 1993, Vol. 8(No. 1): 246-254.
[15] M.R.lrving SOO. Economic dispatch of generators with prohibited operating zones: a genetic algorithm approach [J]. IEE Proe-Gener Transm Distrib, November 1996, Vol. 143(No. 6): 529-34.