Analysis on EPC Project Management Points and Countermeasures

Download as PDF

DOI: 10.23977/emsshr.2019.106

Author(s)

Lu Wenzhe

Corresponding Author

Lu Wenzhe

ABSTRACT

From the analysis of the EPC (Design-Purchasing-Construction) general contracting mode, the most critical point and core of the model is the structural design and management of the project, which has a direct and significant impact on the quality, duration and cost management of the project. In this study, the author combines his own experience, from the perspective of changing concepts, strengthening communication, controlling progress, strengthening quality, and improving the site, to analyze how to avoid the risks of the engineering projects to the greatest extent and maximize the benefits.

KEYWORDS

EPC, general contracting mode, structural design, maximization of benefits

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.