Research on the Management Mode of Utility Tunnel Maintenance and Operation in High-Tech Zone Based on Bim Model
Download as PDF
DOI: 10.23977/ieesasm.2019.598
Corresponding Author
Wang Lifeng
ABSTRACT
In the traditional two-dimensional information transmission and communication mode such as drawings and characters, there are many problems, such as multi-disciplinary design objects are easy to conflict, complex nodes are difficult to express, and engineering information is difficult to obtain in real time. Utility tunnel building information model (bim) data, bim information data of corridor pipelines, monitoring information data and information around the corridor are integrated into a whole, and a collaborative management platform with bim as the core is built by using internet of things technology, thus solving the problems existing in utility tunnel's later operation and management. This paper uses bim technology to analyze the advantages of bim in operation and maintenance management in utility tunnel. Combined with the operation and maintenance management project of utility tunnel project in high-tech zone, this paper introduces the construction of bim-based intelligent operation and maintenance management system in utility tunnel, which provides a relatively perfect integrated solution for operation and maintenance management in utility tunnel.
KEYWORDS
Bim Model, Maintenance of Utility Tunnel, Operational Management, Information Technology, Three - Dimensional